
IKEA CFC
New Cairo2012–2013ECG150 t

6th of October City2014–2015
Commercial shopping destination reference with Shaker listed as consultant and a quantity of 45 tons.
Mall of Egypt in 6th of October City is a commercial shopping destination and one of Duct Technology's retail references. HVAC ductwork was supplied during 2014–2015 with Shaker as consultant and a recorded quantity of 45 tons, fabricated to the project drawings and the consultant's requirements.
The table below records the facts held for the Mall of Egypt project: where it is, which sector it serves, when the work was executed and who the consultant or contractor was. Quantities are tons of ductwork recorded in Duct Technology's reference list.
| Attribute | Detail |
|---|---|
| Location | 6th of October City |
| Sector | Commercial |
| Execution period | 2014–2015 |
| Consultant | Shaker |
| Recorded quantity | 45 t |
| Scope | HVAC ductwork |
Send your drawings, quantities and consultant specification. Our estimation team will respond with a technical review and a quotation.